Home
Marine Equipment Spreads
Land and Station Equipment
Corporate Data Sheet
Typical Projects
Contact Us
Typical Projects
  • 12” Concrete Coated Pipeline Lowering in Beach, Shoal, and Bay Areas through reefs, sand, and soil, including hydro testing and re-commissioning
  • Mainline Valve Replacement, 3’ Water Depth (Beach/Bay Area)
  • Pipeline Cleaning and Re-commissioning, 8 miles-4’ (Marsh/Swamp area)
  • 2-Complete Well, Line heater, Flowline, and Pipeline installation (Marsh/Bay Area)
  • Removal of abandoned Transmission Laterals and Flow lines for regulated pipeline companies, in Environmentally Sensitive Marsh Area
  • Mainline Valve Station Site Restoration and Shoreline Mat installation, 3’-0’ Water Depth
  • 12” Concrete Coated Pipeline Lowering in Bay Areas (across the head of passes)
  • Upgrade and Hydrotest of 5-8”, 12”, and 16” - LPG Pipelines (16 miles), (Land and Inland Marine)
  • Installation of 1,300’ of Vinyl bulkhead for shoreline protection in Environmentally Sensitive Marsh Area
  • Transmission Company Interconnect to Other Transmission Company with platform, piping, and SCADA retrofit in Environmentally Sensitive Marsh Area
  • Transmission Company Meter Stations for lateral tie-ins
  • 30” HCA Project – Replacement of 3,000’ (Land)
  • 20” Diameter Atchafalaya River Directional Drill Pipeline Replacement (Swamp to Swamp)
  • Shoreline Restoration at Pipeline Approaches including rocks and bulkheads
  • Pipeline System Sign, Bulkhead, and Rock Installation (Marsh Areas Across Louisiana)
  • 14” Pipeline Removal across Lake Pontchartrain (90,000’)
  • 12” Transmission Pipeline across Marsh Fields 55,000’ Concrete Coating
  • 12” Anomaly Repairs (Land, Water and Marsh)
  • Mainline Compressor Station Installations



 

|Home| |Marine Equipment Spreads| |Land and Station Equipment| |Corporate Data Sheet| |Typical Projects| |Contact Us|